27
May
Groundwork in Essex
Milbarn Construction have been recently completed the installation of a new water main at Grange Waters in Essex for Thurrock Council.
A trench had to be dug approximately 250meters in length between the depth of 750mm and 1350mm so the new water main could be laid. The water main has to be laid within these depths so that it will not freeze during the cold spells, We averaged our depth at 1100mm.
Below are some photos of the groundwork required
Work was completed early and within budget. If you are looking for Groundwork services in Essex, contact us for a chat. We are able to undertake small and large work.